boiler insulation glass wool material

2, ensure that the boiler insulation glass wool material water, electricity, gas;

3, looking for experienced, competent fireman;

8000 flat site require much gas hot water boiler insulation glass wool material? In the boiler market, gas hot water boiler range of applications is quite extensive, but many users on the relationship between the boiler tonnage and use of the area is still relatively confused, the following Xiaobian take you to do a simple understanding. To address this issue, we basically have to consider the following questions: (1) we buy the specific needs of hot water boilers used to do, atmospheric pressure or, if we want to purchase heating boiler, also heating, they sterilize, but also used in a variety of conditions, then we will need to consider, as appropriate, how the tonnage, the number of units planned. The specific case of thermal efficiency (2) we choose hot water boiler, configuration, etc. What, high thermal efficiency, a variety of configurations cost is relatively high, the benefits arising from natural boiler operation will be relatively high, it is boiler does not need too much tonnage. (3) our boilers space hardware facilities What specific temperature, altitude and other natural conditions is kind of how, if we use the boiler temperature and altitude are high or low, then we then need to tonnage and reasonable adjustment of the boiler based on the actual situation, of course, also need to take into account the specific circumstances of the boiler room. In short, the 8000 level venue, under different conditions and state of tonnage and the number of units required for the boiler will be different, which would require the specific conditions. Generally, under normal circumstances, the basic needs of the site 8000 level of around one ton gas hot water boiler.

Recently, Jinan City issued a "supplementary notice on accelerating the city's boiler insulation glass wool material-depth treatment of work-related" and formulated the following objectives.

I, on the in-depth treatment of boiler completion time. Low Nitrogen transformation and the transformation of the city's ultra-low emission gas-fired boiler biomass boiler to complete the appropriate time to relax, and strive to be completed in the end of June 2019, due to the commitment of heating (cooling) or involving people's livelihood and other support complex transformation process of the boiler furnace, indeed practical difficulties, completion time may be extended to the end of October 2019.

Second, on the in-depth treatment boiler standards. According to the "program tackling autumn and winter", the low nitrogen gas boiler after transformation, in principle, is not higher than the concentration of nitrogen oxides emissions of 50mg / m³, according to encourage the transformation of 30mg / m³. Encourage the transformation of biomass boiler with ultra low emissions coal-fired power plants.

Third, on the time-depth treatment of boiler arrangement. 2018 10 completed before the end inventory information verification, planning work; organize the implementation of the completion of the work before the end of May 2019; the end of June 2019 to complete the inspection work (due to heating and other disabled do not have to bear the acceptance conditions, available at the end of November 2019 before the completion of acceptance).

Fourth, on the information submitted to the work. Please ring the economy Zi [2018] No. 175 document complements the "Jinan City gas boiler investigation Summary Sheet" on or before October 12, "Jinan biomass boiler investigation Summary Table" to the Municipal Environmental Protection Bureau. On or before October 26, the "Jinan City Boiler depth management plan summary table", "Jinan hole sampling and sampling platform standardization construction unit summary table" and has completed the in-depth treatment of the boiler reconstruction proved supervisory monitoring report submitted to the Municipal Environmental Protection Bureau . Since the beginning of November, every Friday morning before 10:00 (for the first time submitted November 2) the progress of reform in-depth treatment of each unit case to the Municipal Environmental Protection Bureau.

First of all, according to the development direction of the current ecological environment of coal-fired boiler insulation glass wool materials will be gradually replaced by gas boilers or other more environmentally friendly clean energy boilers, and gradually withdraw from the stage of history.