side bown vertical oil fired hot water boiler

To people a good living environment, the Sichuan Provincial Government to respond positively to the national environmental policy, released the latest notice "Sichuan Province to win the Battle of Blue Sky" and other embodiments of nine. Which highlighted: increase Condensing units and cogeneration units technological transformation efforts, speed up the heating pipe grid design. In areas do not have central heating conditions, the existing multiple small coal-fired boilers, to replace the principle of construction of large-capacity coal-fired boilers in accordance with the same amount. For shutting down key areas of environmental protection, energy consumption, safety and other 300,000 kilowatts coal-fired units of non-compliance.

Scientific and orderly promote clean energy development and utilization of hydropower, natural gas (shale gas), wind power, solar, biomass and so on. As of 2020, the province's hydropower installed capacity reached 79 million kilowatts, the proportion of non-fossil energy consumption reached 37.81%, increase the proportion of natural gas consumption to 16.19%.

The implementation of "Sichuan" Thirteen Five "energy development plan" requirements on coal consumption, increase the intensity of coal washing, coal simultaneous construction of new coal washing facilities, supporting the completion of existing coal mines coal washing facilities in accordance with points Area. Improve coal quality and use of industry standards, do not comply with the provisions of commercial coal quality management and environmental protection requirements of the indicators listed commercial coal. Prohibit the circulation and use of low-grade bulk coal, bulk coal investigated and dealt with according to the law without a license behavior. Increase the civil bulk coal clean governance efforts to promote electricity instead of coal, substitution of gas for coal, to promote the use of clean coal, advanced civilian stoves, strengthen civil bulk coal management. Strengthen regulation and control coal use in autumn and winter. For shutting down key areas of environmental protection, energy, security and other non-compliance of more than 300,000 kilowatts coal-fired units.

25 ton natural gas boiler used in a Malaysia food factory

This 25 ton natural gas boiler used in a Malaysia food factory is the szs series oil and gas water tube boiler produced by CBM. Food factories are inseparable from steam boilers. The SZS series oil and gas fuel boiler is a double drum vertical D-type boiler with fast assembly water tube structure and micro positive pressure in operation. The boiler adopts whole membrane wall structure, water-cooling wall uses close-row structure which ensures the boiler has high performance and is suitable for heat radiation exchange.

Structure and characteristics of Water Tube Boiler (double Longitudinal Tube Boiler)

The structure of the double vertical tube water tube boiler is mainly composed of upper and lower vertical tube, convection tube bundle, water wall tube, header box and down tube and other pressure-receiving components. The length of the lower drum is about half shorter than that of the upper drum. The empty space is provided with a furnace, a curved water pipe is arranged between the two drums, and a water wall tube is arranged around the furnace. The burning equipment adopts a gas/oil burner, and the tail flue has an economizer. The boiler evaporation is generally less than 20 tons / hour (t / h), the working pressure is less than 2.5 MPa (MPa). The high-temperature flue gas enters the rear convection flue from the right exit of the furnace, flows in an S shape along the two smoke-proof walls, flushes the convection tube bundle laterally, and then flows through the economizer from the left side of the furnace wall, and is discharged by the induced draft fan and the chimney.

Electric steam boiler before the preparatory work needs to be done to prepare the working electrode is a kind of steam boiler power for energy conversion from electric energy into thermal energy, the hot water or organic heat medium (HTF) is heated to a certain portion of the boiler through the heat exchanger parameters (temperature, pressure) and externally output has a nominal thermal Machinery working fluid. The use according to electric boiler can be divided into: KS-D electric water boilers, CLDR (CWDR) electric water boiler (including an electrical heating bath boilers and electric boilers), LDR (WDR) electric steam boiler. Steam boiler is the production of specified parameters and quality of steam boilers. Quasi-electric boiler steam preparation work needs to be done to prepare one thousand work (1), the operator must understand the working principle of the boiler, location, performance and working methods of the various accessories. (2), check the oil combustion, and each nozzle connection, power supply and the burner, the pump, the boiler installation accessory. (3), a clear main steam valve open, after closing the normal close it. (4), water level gauge inspection, confirmation flexible water level, normal position. (5), the pressure regulator is properly tuned, regulate combustion damper.