manufactured by industrial boiler co ltd

Let us look at maintenance sites of horizontal steam manufactured by industrial boiler co ltd components and maintenance requirements of horizontal steam boiler is more important, the device can reduce the runtime failure, increase the service life of the boiler, noteworthy task. 1, water table maintenance: (1) cleaning interior surfaces, keep clean and (2) replacement of packing, gasket (3) repair or replace the water table 2 cocks, calibration gauge: (1) check gauge and leaded closure (2) and the trap inspection split three-way stopcock, rust appearance 3, safety valve: (1) overhaul, adjustment valve (2) 4 timely replacement of damaged parts, boiler maintenance: (1) removal of heat the outer surface of the soot and the inner surface of the scale (2) and expansion weld inspection at boiler (3) an outer access waterwall tubes (4) lights up lacquer boiler (5) in full or disabled 6 over 1 year boilers, pressure test should be carried out. 1 year of operation, the furnace should be a stop outside the test 5, the furnace walls and furnace maintenance: (1) repair replace damaged boiler steel (2) maintenance of the furnace, the furnace wall, repairing the furnace wall leak smoke, air leakage and defects internal corrosion of furnace wall (3) fix the insulation layer 6, and maintenance of coal slag hopper means: (1) Check the stoker, Java machine (2) maintenance of the hydraulic actuator, cylinder wear cup should be replaced ( 3) adjusting the grate (4) and run auxiliary operation

Boiler operation common accident which 1) manufactured by industrial boiler co ltd water boiler severe water shortages will cause pressure components deformation and damage, explosion or even furnace tube, if not handled properly boiler explosion may occur when the boiler water found water should be prohibited, and to take urgent measures to shutdown. most causes of the accident with water boiler operators and misuse related to lax paralysis, or the water table due to the non-clogging rinse measures related failures. (2) Priming Teng priming features are: water table level volatility, boiler water foaming, with a large amount of water steam, the steam temperature is lowered, a serious impact occurs in the water conduit is the main reason for this situation: poor water quality, salt is too high or too fast increasing boiler load and the like. priming found necessary to strengthen and increase the continuous sewage water treatment. (3) boiler overpressure. overpressure boiler operation, ranging element is deformed, damaged at side continued ; severe cases can cause an explosion accident occurred mainly due to boiler overpressure is: fireman who blindly increase the working pressure or trespassing caused from work sometimes, due to the pressure gauge and relief valve malfunction at the same time also. Boiler overpressure caused. Therefore, we must strengthen fireman personal responsibility and safety inspections of the attachments. (4) blast furnace tube when the tube blast furnace, a significant explosions, the sound of jet steam, while the water level and steam pressure was significantly the decline where they are found, action must be taken to an emergency shutdown general reason for this situation is: poor water quality caused by the furnace tube fouling or corrosion; water and burst pipes may also reinforce each other; in addition, because of the design defects, lack of material strength and poor weld quality, are likely to cause tube rupture.

Shandong Zhaoyuan Mining Group Co., Ltd. is a large state-owned local asset management companies, gold mining dressing and smelting for leading industries, operates in the area of ​​tourism, services, precious metals, real estate, eco-agriculture, with total assets of 10.2 billion yuan, Shanghai gold Exchange is an international provider of standard gold bullion. July 2017, Shandong Mining Group and fast manufactured by industrial boiler co ltd steam signed a 0.5-ton electric heating steam boiler which mainly produce steam for metallurgical mineral processing and other manufacturing processes, energy defeating small, strong ability to supply steam .

First, hot water manufactured by industrial boiler co ltd energy consumption caused the main reason is that the lack of unified planning boiler before being put into use in the development plan, no comprehensive analysis and identify issues, for hot water heating, and with the new piece of planning lack of understanding of the problem. Therefore, when building the boiler room, there may be a planning area does not match the actual area occupied or poor interfaces connecting pipes, etc., the boiler barely put into use, energy efficiency, achieving the desired effects.