chinese factory price steam boiler pressure gauge

Circulating fluidized bed(CFB) boiler with biomass as fuel, adopting the basic technology independently developed by ZG,have been in commercial operation. There are introduction

The figure is my company in Langfang City, Hebei Province, Guan Xian do heating boiler project, two boilers are 58MW and 29MW.

With the aim to seize the key regulator, to avoid runs the risk of daily normal operation, with the key purpose of regulation is to maintain stable parameters to maximize the economic unit, requires us to be careful operation, careful adjustment, patient monitoring. The abnormal operation in the unit should be required to take a different operating modes to be adjusted. For example, coal coke is easy, when high volatile, high moisture, etc., to time requires adjustment for the purpose of safe operation, it is necessary to take appropriate way to ensure safe operation of unit operation. Especially when incident handling, not to expand the accident, for the purpose of recovery as soon as possible, requiring staff to run a pretty good idea, seize the adjustment key, adjust the timing to avoid mistakes, causing the accident to expand. For example, when the turbine load rejection, boiler water level regulation is the key, not timely reaction will be water accidents; and in the boiler fire, check the FSSS action is correct or not is the key, if FSSS failed to cut off fuel, causing deflagration, or not timely closure caused by warm water turbine water impact, it makes the accident and suffered serious losses.

To people a good living environment, the Sichuan Provincial Government to respond positively to the national environmental policy, released the latest notice "Sichuan Province to win the Battle of Blue Sky" and other embodiments of nine. Which highlighted: increase Condensing units and cogeneration units technological transformation efforts, speed up the heating pipe grid design. In areas do not have central heating conditions, the existing multiple small coal-fired boilers, to replace the principle of construction of large-capacity coal-fired boilers in accordance with the same amount. For shutting down key areas of environmental protection, energy consumption, safety and other 300,000 kilowatts coal-fired units of non-compliance.

Scientific and orderly promote clean energy development and utilization of hydropower, natural gas (shale gas), wind power, solar, biomass and so on. As of 2020, the province's hydropower installed capacity reached 79 million kilowatts, the proportion of non-fossil energy consumption reached 37.81%, increase the proportion of natural gas consumption to 16.19%.

The implementation of "Sichuan" Thirteen Five "energy development plan" requirements on coal consumption, increase the intensity of coal washing, coal simultaneous construction of new coal washing facilities, supporting the completion of existing coal mines coal washing facilities in accordance with points Area. Improve coal quality and use of industry standards, do not comply with the provisions of commercial coal quality management and environmental protection requirements of the indicators listed commercial coal. Prohibit the circulation and use of low-grade bulk coal, bulk coal investigated and dealt with according to the law without a license behavior. Increase the civil bulk coal clean governance efforts to promote electricity instead of coal, substitution of gas for coal, to promote the use of clean coal, advanced civilian stoves, strengthen civil bulk coal management. Strengthen regulation and control coal use in autumn and winter. For shutting down key areas of environmental protection, energy, security and other non-compliance of more than 300,000 kilowatts coal-fired units.