capital cost of rice husk boiler

July 26, 2016, Beijing, China Everbright Paper Co., Ltd. and the company signed a "split 6 tons of steam condensing gas steam capital cost of rice husk boiler contract" by the company responsible for the WNS6-1.25-YQ split condensing gas boiler steam to all production, installation and commissioning work. The product is the use of condensing technology, effective emission of harmful substances SOx, NOx, COx, is industrial boilers efficient and environmentally friendly solutions.

A gas capital cost of rice husk boiler maintenance, boiler feed water gas manufacturers give the boiler 1. Maintenance must be qualified treatment, which is to extend the life of the boiler, ensure the safe operation of the important issues. 2. The water temperature should be close to the furnace temperature, preferably above 20 ℃. 3. The need for low-water cutoff periodically inspect maintenance and cleaning. Water Level Controller cleaned at least once a month, rinse water table at least once a day. Rinse water table should be at the highest level; after flushing the water level should not be less than the minimum safe level, not as a net wash, can wash many times, but it must be flushed at the highest level. 4. require periodic blowdown operation, daily (per shift) at least once, after the sewage drain valve should be checked whether the influence by dirt and leaks; if it must be excluded. 5. Shutdown the steam pressure is not maintained, the boiler will produce steam space negative pressure air entrapment, and therefore should rise again to the fire burning total steam valve is opened. 6. smoke tube fouling will lead to increased exhaust gas temperature, so that boiler efficiency is lowered, so that the fuel consumption increases, it should periodically open the front door, brushing or blow smoke tube fouling. Second, the shutdown maintenance and corrosion in boiler 1. After the shutdown, in order to prevent corrosion of the pot must be maintained. 2. Short-term maintenance. Wet regimen employed; i.e. after the shutdown, the water will fill the furnace, the entire exhaust air. 3. Long-term maintenance. Regimen can be dry, i.e., after the furnace shutdown drain the water, open the lower hand hole, dry water pot, and through the lower hand hole, into the drying agent, and should be replaced periodically, may start to replace monthly check - times, after three months may once. It should be noted, before the boiler is enabled, be sure to remove all desiccant. Third, monitoring and maintenance of the boiler 1. The operation of every checking operation key and rotatable member boiler safety device for 1 hour to conduct an inspection apparatus. 2. Check the boiler equipment, testing and regular operation of the project cycle, make specific provisions and loading site as an icon. 3. Run the personnel records based on timely completion of the inspection. 4. The site must be kept clean, so that no debris, no fouling, no water, no grease.

From the degree of heating of the product, and now the election of steam capital cost of rice husk boilers practical effect is very clear, based on the conversion of thermal energy, and improve the steam plant now, people now demand for heat continues to be improved, including the power generation process, now mechanical energy into electrical energy is concern the market now.

Large plant CFB steam capital cost of rice husk boiler manufactured by ZG will be exported to Brazil recently.ZG has been awarded a contract to supply the first two Circulating Fluidised Bed (CFB) boilers ever to be installed in Brazil large plant.Under the contract,ZG will provide two modular CFB steam boilers for a Large plant 2 Project in Brazil.