new zeland steam boiler

Quietly tell you, the key factors that determine the life of condensing boiler: A condensing boiler through the excellent quality of the latter proper repair and maintenance, service life up to 20 years, with reduced thermal efficiency does not occur. So, the key factor in determining condensing boiler life, what does? Fast boiler to tell you!

Winter is the peak heating heating, but also prone to accidents of special equipment such as boilers. To effectively prevent and curb the occurrence of accidents, equipment thorough investigation to eliminate safety hazards, Hunan Province to carry out safety hazards investigation work in the province within the boiler, boiler equipment and punishes the security measures are not in place.

Yueyang City bearing the brunt of the provincial government in response to the call for in food, pharmaceutical processing industry, boiler equipment, pressure vessels, pipelines, etc. investigation and remediation, further investigation and security risks, strengthen supervision, which ensures safe operation of special equipment.

Zhuzhou City, the relevant departments to implement the special equipment safety responsibility, collective interviews conducted meetings, some special equipment overdue inspection or rectification in place of business risks not to be interviewed. In order to urge them to get inspection reports in order to restore operation, to ensure the safe use of special equipment. But also warned of these enterprises, if not through legal regular inspections, not only safety and production are not effectively protected, will be severely punished.

Oil-fired boiler oil-fired boiler in Sheung Shui procedures ready for operation under cold circumstances, we must first understand the boiler water filling system without fault, and therefore should be done before firing boiler water filling trials to test boiler water filling system is normal, pipeline The valve leaks. Sheung Shui basic procedures: (1) upon inspection of boiler meet the operational requirements, in order to carry out work in Sheung Shui boilers; before (2) Sheung Shui, you must get in touch with the boiler water quality testing staff to ensure that water treatment is working properly, to avoid affecting boiler Sheung; (3) open the power, boiler exhaust valve opening, to start the pump, check the water pressure is greater than the working pressure of the boiler fuel, to open the valve, to boiler Feed; (4) while the boiler Feed, open sewage drain valve, drain valve open inside, the outside open the drain valve, the drain valve closing the outside, inside the drain valve closed, 2nd outer opening the drain valve, 2nd outer drain valve closed, after rinsing pot, close the drain valve to continue the boiler water filling; (5) the pot water level reaches the normal level, to turn off the water supply pump is stopped, the exhaust valves; (6) for water drainage test table, the drain valve open water table, the water table confirm normal, closed water gauge release valve, wait ignition. These are the basic operating procedures of the oil-fired boiler we hope for their own lives and property of others and strict adherence Of course, if you have anything unclear our online customer service always welcome your online consultation.

How to determine whether the module boiler manufacturers of professional formal professional set formal module boiler manufacturers to give everyone who supply senior, targeted one to one industrial design, and are set to give you a more professional supply module boiler system plans to ensure that you can in line with the best standards in the industry, you can have a super high price, make sure we did not purchase any other burden of money, the choice of performance and in terms of security, you can get the most awesome formal standard.