hot water boiler 50 liter getra

What checks should be done before the gas-fired boiler starts?

Because gas-fired boiler is a kind of container equipment with steam and pressure, it is easy to cause accidents if the safety code is not followed in the course of operation, so, Gas-fired boiler operators must follow the rules and regulations to implement the relevant procedures and make good operation and shift records. The following is a high-stability gas-fired boiler manufacturers to introduce what checks should be done before the start of the furnace.

1. When checking the appearance and gas pressure of the boiler, when preparing to start the gas-fired boiler, the on-duty furnace worker should first do a comprehensive inspection, including the appearance of the boiler, the valves and the connecting parts, and then check the pressure of the gas. Ensure that the pressure value is within the normal range, not too high or too low, and that the gas supply valve cannot be opened until it is checked and confirmed to be normal.

2, check the water supply system gas-fired boiler when burning, there should be water inside, otherwise there will be danger. Therefore, before the stove is opened, the boiler workers should check the water supply system and see if the pump can supply water. If the water supply is not properly switched on, the exhaust valve should be opened and ventilated, knowing that the pump can start the water supply. Then open the valves in the water supply system.

3. Checking the water level if too much or too little water in the gas-fired boiler will have an impact on the safe operation of the boiler, it is very important to check the water level gauge well before the start of the furnace. Because the function of the water level gauge is to let the stoves know how much water there is in the boiler at the moment. Therefore, before starting a gas-fired boiler, it is necessary to see whether the position of the water level gauge is normal or not, and also to see whether the level gauge and color plug of the water level meter are in the open position, so as to avoid the phenomenon of false water level, and then to observe whether there is a shortage of water. If lack of water can manually carry out boiler water filling.

This partnership reflects a significant leap in energy provision with three key industry players joining forces to bring cost, environmental benefits and energy savings to the UK’s breweries which use steam as part of their production processes and sanitization, said the Managing Director.“We are delighted to be working alongside two established manufacturers who have a combined 70 years expertise to collectively deliver the very best in cost-effective steam boiler technology.”

Cade Shopping Mall is located in central Shanghai Hongkou District, Shanghai Daily larger flow of people in the region. The introduction of Shanghai air pollutant emission standards, boiler flue gas emissions of nitrogen oxide emissions to less than 80 mg / m, Shopping Mall a coal-fired boilers have been used for many years, NOx emissions far super to this request, the urgent need to replace more environmentally friendly low nitrogen emission boilers. Other units through the use of fast Boiler introduction and understanding, determined and fast boiler to achieve cooperation, party fast to their specific needs to recommend one condensing gas hot water boiler 50 liter getra of a 4.2MW for heating needs of the shopping center.

Gas-fired boiler installation process: after the user bought gas boilers, installation is also a priority. Master the correct knowledge boiler installation, boiler in order to avoid problems appear after the late stage.