49mw olive residue steam boiler

Professional technology needs to be provided by professional personnel, so the company should employ professionals from all walks of life to carry out the production of 49mw olive residue steam boilers at the expense of heavy money. Only in this way can the production of high-quality products for the development of the company. You should know that the interests of customers are closely related to the company, once the customer does not get any benefits from the product, the company will lose more. As a result, the company needs specialized technology to produce high-quality steam boilers, otherwise the company's development will be stalled and the interests of its customers will be seriously affected.

The significance of boiler blowdown:

(1) An important part of the water treatment work during boiler blowdown is an important means to ensure that the boiler water quality meets the standard requirements.

Gas hot water boiler blowdown resolved at a regular cause of temperature rise boiler blowdown boiler during operation of the essential part, then there will be a lot of people wondering, gas hot water boiler blowdown is a regular temperature rises What reason? Xiao Bian below Zhengzhou party quickly take you to do a simple understanding. During periodic blowdown gas hot water boiler, the discharge is substantially the furnace has reached the saturation temperature of water, the boiler feed water is substantially during low-temperature water, and that in this process, in order to ensure a stable evaporation of the boiler, it is necessary to increase the quantity of fuel, then at the same time at the furnace exit flue gas temperature and flow rate will increase, and therefore the temperature will rise. Then another angle, if the fuel is maintained constant number, then that particular portion of the amount of fuel will be used to increase water temperature, the heat of the steam will be reduced, at this time the furnace flue gas outlet temperature and flow rate did not change, the temperature will rise. Therefore, gas hot water boiler temperature rises in the periodic blowdown is normal, until the end of boiler blowdown regularly, this phenomenon will not happen again when the recovery boiler steady state operation. But one thing to note here, when long boiler on a regular basis to control sewage, excessive sewage may cause loss of heat boiler city, should the boiler feed water is not timely, it is also possible to cause the boiler water shortages, causing unnecessary boiler accident, so exercise caution. Above, is the small series of personal views and opinions, we hope everyone will help.

In order to further standardize Xuzhou City, air pollution control construction and operation management, protecting and improving the quality of the environment, prevent environmental pollution, introduced the "Xuzhou City in 2019 the thermal power industry, air pollution control basic norms." For the raw fuel storage, handling, transportation, storage byproducts, transport, collecting and centralizing the flue gas treatment systems and other aspects of the essence of the specific requirements.

First, all coal-fired units desulfurization facilities required to install, in addition to coal-fired circulating fluidized bed boiler units to be installed denitration facilities, coal and biomass fuel units to be equipped with efficient dust removal facilities. Desulfurization, denitrification, dust removal device processing capabilities must meet the production needs, we must be able to maintain long-term stable operation, must be professional manufacturers design, produce qualified products. Exhaust pipe shall be provided with permanent sampling ports and in accordance with national and regulatory requirements related to the construction of Jiangsu Province.

Second, the boiler produces air pollutants must be in accordance with national standards and requirements related to Jiangsu Province, construction of flue gas collection systems and centralized purification facilities, flaring has been the implementation of "coal to gas," "dry FGD" and included in discontinued closure plan outside the coal boiler, and the rest are required to install the cooling and dehumidification systems, and to ensure proper operation.